Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Sikka to Yangon

A MR carrying 37,000 tonnes from Sikka to Yangon sails about 2,417 nm laden on the open-sea route, about 8.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 19.8 days and burns about 388 tonnes of fuel.

Round voyage

19.8 d

8.1 d laden

Laden distance

2,417 nm

Shortest route

Fuel (VLSFO)

388 t

Round voyage

CO2

1,223 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Sikka → Yangon

2,417 nm8.1193 t

Ballast

Yangon → Sikka

2,417 nm7.7155 t

Port time

Loading and discharge

—4.040 t
Round voyage4,833 nm19.8388 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 388 tonnes of VLSFO, emitting about 1,223 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Sikka to Yangon?

About 8 days 1 hour laden at 12.5 knots over 2,417 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 19.8 days.

How much fuel does a MR burn on this voyage?

About 388 tonnes of VLSFO for the round voyage (193 t laden, 155 t ballast, 40 t in port), emitting about 1,223 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy